Commercial Permits
How to Apply for a Commercial Building Permit
- Fill out a Building Permit Application
- Submit 3 plan sets with Cover Page that includes required information and any applicable documents
- Submit check for fees made to the City of Lincoln
Submit Permit Package
Bring application, plans, applicable documents, and check to the Building Counter located on the 2nd floor of City Hall.
Commercial Plan Application Requirements
All Commercial plan submittals must include the following information on the Cover Page |
Title Block:
Site plan:
Page Index:
Building Data section:
Accessibility Data section:Must include Building Code Analysis with Code path, if clarity is needed or required. Project Scope of workPlease include a scope of work. General NotesPlease include general notes. Deferred Submittal SectionSome items cannot be deferred, but please include if applicable. Formatting RequirementsMinimum Plan Page is 18”X 24”, 1/8 scale, and #10 font. |
You can also download a handout with the Commercial Plan Application Requirements.
Stamped Plan Requirements
Some projects require plans prepared by a California Licensed Architect or Engineer. Please see Stamp Requirement Handout for details.
Accompanying forms and handouts
Depending on your project, you may need to reference or submit some of the following forms along with your building permit application.
- Accessibility Upgrade Worksheet
- Alternate Materials or Methods of Construction
- Asbestos Info
- Construction Waste Management (CWM) Plan
- Design Criteria City of Lincoln
- Electric Vehicle Charging Station Handout
- Electrical Load Calculation Worksheet
- Erosion Control Best Management Practices (BMP)
- Guidelines for Home Repairs and Remodeling
Fire Systems or Fire Sprinklers
Please fill out a Fire Systems Permit Application
Must have obtained a Fire Flow Report prior to permit application submittal.
Building Inspections
All building permits require at least one building inspection. Please schedule your building inspection before 3pm at least one business day in advance.
Requesting final inspection for a commercial development project?
Please complete Commercial Building Permit Routing Form at least 15 working days prior to Final Building Inspection date. Email completed form to Community Development Department - Permit Center.