Lincoln Blvd Phase 2 Construction Update

Print

Lincoln Blvd Phase 2 & 1A

About the Project

Lincoln Boulevard is getting revamped! The Lincoln Boulevard Improvements Project will create a friendlier and safer environment for pedestrians, bicyclists, and Neighborhood Electric Vehicle (NEV) drivers along Lincoln Boulevard, the main street through downtown. 

 Lincoln Blvd Phase 2 Construction-1

The City is preparing to begin construction on Phase 2 of the project.

Phase 2 includes:

  • New curbs, gutters, and sidewalks
  • Bulbout curb returns, including clay tile banding
  • ADA compliant curb ramps
  • Improved streetscape including new trees, landscaping, and irrigation
  • Restriping, removal, and replacement of loop detectors(a loop detector alerts traffic lights to change in the direction you are traveling)
  • New traffic signals
  • Drainage improvements

Click here for Drawings: Lincoln Blvd Phase 2 - Drawings-11x17 (Conform Set)

 Construction Schedule

Start: Late April 2018

End: Late November 2018

  